希尔顿酒店机电要求要点

阅读: 评论:0

2024年1月31日发(作者:)

希尔顿酒店机电要求要点

Main MEP Requirements

酒店主要机电设施要求1 AC and Smoke Exhauting System空调和防排烟系统2 Water and Fire-fighting System给排水和消防系统3 Electricity System强电系统4 Security, BMS, Accounting, CCTV, Dimming System etc.弱电系统5 Other Important Items其他重要项目General Requirement 总体要求: Hotel infrastucture must be independent system. Otherwise,

hotel must control all main MEP plant rooms.

酒店机电系统必须是独立的. 否则,酒店必须控制所有的机电主机房.1 AC and Smoke Exhauting System空调和防排烟系统No序号Item项目HILTON Requirement希尔顿要求Item名称Summer Tem and RH% max最大夏季温度(度) 最大湿度Winter Tem and RH% min最小冬季温度(度) 最小湿度Lobby 大堂Restaurants &

FunctionRooms

餐厅和会议室Guestroom客房Guest Room Corridors

客房走廊Parameter参数的采用Administrative Offices

行政办公室Kitchen

厨房Laundry and Valet

洗衣房Swimming Pool

游泳池2355%2355%2355%2355%2355%27 60%2760%28

60%22

55%2760%22

50%2230%2230%2230%2230%2230%2012028

60%20Gym健身房StorageRooms 仓库Computer Room

电脑房2022

30%Note: 所有酒店各个区域需有新风供给。新风量请参照希尔顿设计指南并经希尔顿技术服务部审阅。

No序号Item项目HILTON Requirement希尔顿要求21. The chillers should be sized allow at least 100% design capacity with one unit not operable. 2. Provide A/C

Cold and Hot Sourceincluding cold and hot during transition period.

最小冬季温度(度)

最小湿度1. 制冷机容量的选择为当一台没有运转时,其他制冷机应能带至少100%的总负荷。冷热源设置2. 过渡季节有同时供冷、供热要求,过渡季节应保证提供空调冷、热水。

3A/C System空调系统1. 4 pipe system. For guestroom, F.C.U AND frshe air intake. For public area such as ballroom, meeting rooms,

restaurants etc. AHU system will be used. 2. Humidity provided by steam or electrical heating. 3. Provide

steam for Laundry(Hilton require on site laundry service).

1.空调水系统应采用四管制系统,客房采用四管制风机盘管加新风系统。对于客人公共区,如宴会厅、会议厅、餐厅等,空调系统的设计采用全空气的空调系统。2.加湿应采用蒸汽或电热加湿。3.洗衣房及厨房提供蒸汽系统(希尔顿要求完整的洗衣房)。4Ventilation System

通风系统e only metallic ductwork. 2. The range hood exhaust ducts are to be fabricated of stainless steel.

1. 只能使用铁皮风道. 2.厨房烟罩排油烟风道用不锈钢材料.Provide staircase pressurisation/ventilation and smoke extract systems to comply with Chinalocal fire

regulations. 楼梯间加压送风和排烟系统符合中国规范.5Smoke Ventilation

防排烟系统参数的采用6Noise and Vibration

Noise standards:主要房间 噪音标准Guestroom客房: DB35Control

噪音、减振控制AHU room(preferred)Shall have water supplying and drainage pipe. Floor are water proof.

要有给水管和排水管道, 地面防水.风柜机房

er room. substation or room. and Fire

Control cold dish rooms,chocalate room, pastry room. e room. 9. Beverage

Split A/C

Installation(OP)分体Store.(Condenser should be installed in suitable place).

1.电脑房2.配电房3.电梯机房4.交换机房5.电视机房6.监控中心.7.所有冷菜间,巧克力房,裱花间.8.垃圾房

空调安装(OP)9.酒水仓库. 10. 干货仓库.(注意: 冷凝器需考虑放在合适的位置)782 Water and Fire-fighting System给排水和消防系统No序号Item项目AHILTON 要求Design Standard设计标准1Water consumption

The average consumption per guest night is between .50M3 - 1.4M3 per guest night.

standard 用水量标准冷水平均用水定额为0.50m3-1.40吨/人.天。All water in the hotel must be potable water and conforms to the world Health Organisation standards(latest

edition). For laundry equipment, kitchen dish and glass washers, and boiler feed, water has hardness below

50ppm and a minimum PH of 6.9. 供水水质需满足饮用水要求并达到WHO 标准(最新版本),

对于洗衣房、厨房洗碗机、洗杯机用水, 硬度小于50ppm.2Water quality

requirement

供水水质、及硬度3Hot water supply

teperature

热水供水温度Hot water is generated and stalled at: 60 degree and temperature control must be accurate and

reliable.供水温度:60度. 温度控制器要准确可靠.41. Two manin pipe water supply. 2. The water supply to the hotel, including storage, must be adequate for

Water supply and

both the daily total water requirement and the instantaneous peaks. The water supply must be reliable with a

Water tank storage

proven history of continuous supply. 3. Adequate 2 compartment / or 2 tank water storage facility must be

供水及生活水箱储provided.

水量1. 两路供水. 2. 至少存储24h酒店用水量. 3. 必须采用2个水箱储备.

No序号Item项目HILTON Requirement希尔顿要求5Minimum pressure at any outlet 150 Kpa

Water supply

Maximum pressure at any outlet 450 Kpa

pressure

最小出口压力:150Kpa

供水压力最小冬季温度(度) 最小湿度最大出口压力:450KpaPipe material水管材质Copper, to ensure quiet operation and to prevent water hammer, shock absorbing devices are installed as

required. 铜管.保证无噪音运转、防止水锤发生,根据需要安装防晃动设施.67Fire fighting water

supplying standard

消防用水标准1、Fire-fighting system must be installed according to local rule and regulation and NFPA.

消防系统必须符合当地防火规章,并应满足NFPA 相关标准。B1System design 系统设计Domestic water

supply system

冷水供水系统参数的采用 Reliable, supply consistently. 系统可靠,满足瞬时流量,保障连续供给。

21. Reliable, supply consistently. 2. Thermostatic valve should be installed for shower area of bathroom. 3.

Hot water supply and

Provide electromagnatic scal inhibitors in the flow connection to each plate heat

return system

exchanger.1.系统可靠,满足瞬时流量,保障连续供给。2.客房内卫生间淋浴混合阀要有温度控制器.

热水供、回水系统3.热水系统要安装除垢仪.3Foul water

drainage排水系统1. Install pipework fittings and accessories to ensure that appliances drain quickly, quietly and completely at

all times without nuisance. 2. Soil vent pipes are to be installed to terminate 450mm above finished roof level

and be complete with a copper wire balloon. 3. Avoid condensate drainage direct connections to drainage

system. 4. Drainage within suspended ceilings are to be manufactured in cast iron.

1.排水系统应保障立管内迅速排水及房间内的安静。2.通气管超出屋面最少450mm,顶部设置铜丝球。3.冷凝水避免直接接入污水管。4.室内立管吊顶内管线采用铸铁管.4Rainwater system雨水系统1. Install pipework fittings and accessories to ensure that appliances drain quickly, quietly and completely at

all times without nuisance. 2. Drainage within suspended ceilings are to be manufactured in cast iron. 3. The

system shall be designed so that it can be adequatedly tested, cleaned and maintained.

1. 排水系统应保障立管内迅速排水及房间内的安静。2. 雨水立管及吊顶内管线采用铸铁管。3.

系统设计要能方便调试,清理和维修。

5Waste water

system中水系统In most cases recyled water can be used economically for road cleaning and irrigation and cooling

tower.中水用作冲洗道路、灌溉, 冷却塔补水等用。6Pool system泳池系统1. Shall be designed by pool consultant. 2. Provide an automatic drain blockage relief or pump shutdown

device on pool equipment. 3. Provide an emergency equipment shut-off switch/button located adjacent to

the whyirlpool that will shut off all jet pumps/blower & re-circulationg pumps. 4. Provide anti-vortex covers

on all primary drains and suction inlets on pool and spa. 5. An approved ground fault circuit interrupter shall

be installed on electrical circuits providing power to the pool equipement, lighting and electrical outlets in the

immediate vicinity of the pool.

1. 由专业泳池公司设计. 2. 提供排水管道堵塞水泵自动停止设施.

3. 在冲浪池近处安装能切断所有冲浪池所有设备的紧急按钮.

4. 所有排水和吸水口的盖子具有防涡旋的功能. 5. 所有设备,灯具和插座要有安全的接地保护.Domestic hot/cold water pipe: copper or stainless steel生活冷热水管: 铜管Underground water pipe: cast iron pipe埋地冷水管:铸铁管Fire-fighting pipe: steel pipe消防管道:钢管Gas pipe: steel or copper燃气管:钢管或铜管Pool, fountain and irrigation: PVC泳池、喷泉、灌溉:PVCDrainage pipe: cast iron排水管:铸铁管Rainwater pipe: cast iron雨水管:铸铁管

Kitchen Hood and exhaust duct: 厨房排油烟管道为不朽钢.7Pipe materail管材

No序号Item项目HILTON Requirement希尔顿要求8Cold and hot water

accounting system冷热水系统计量 1. Location of meter设置水表的区域:(1) Pool泳池 (2) SPA (3)Night Club and KTV夜总会和KTV (4) Beauty Salon美容美发(5) BAR酒吧 (6) Make-up

最小冬季温度(度) 最小湿度water for cooling tower冷却塔补水(7) Make-up water for chillers冷机补水(8) Kitchen厨房(9)

Laundry洗衣房(10)Locker更衣间(11) Guestroom客房(12)Make-up water for hot water system热水补水 2.

Meter need to be connected to BMS. 计量表要求连接到BMS系统3 Electricity System强电系统No序号Item项目Power supply

系统供电Transformer变压器选型参数的采用Power correction

factor无功补偿HILTON 要求At least 2 source electricity feeder which each can take 100% load.最少两路电源输入; 每一路能带所有负荷.

Transformers shall be sized with 20% spare capacity.至少有20%备用容量Automatic stepped power factor correction of 0.95 lagging or better shall be provided.补偿容量使功率因数cosΦ ≥0.95。1234In the event of a mains failure, the gensets shall start within 15 seconds. The engine shall be sized for

required rating,shall be continuously rated and shall include 25% overload capacity. The genset shall be

provided with a day storage fuel tank, capable of supplying the generator with fuel for min24 hours

continnuous run. Back-up gensets should provide power for Fire-fighting and Life Safety system , guest lifts

and kitchen refrigeration when power off. Mainly include following: 1. One Guestlift. 2. All firehydrants and

sprinkler system(pumps and jockey pumps). 3. Smoke dectector and alarming system. 4. PABX. 5. Kitchen

lighting, cooling rooms and refrigerators. 6. Generator power. 7. Sump pumps and sewer lift station. 8.

Sewage treatment plant. 9. Dometic hot and cold water distribution pumps. 10. All pressurized equipment

and smoke exhausting equipment. 11. Computer room including Air Conditioning Split unit, IT and UPS. 12.

CCTV system. 13. Emergency broadcasting and lighting system. 14. Car park entry/exit barrier system. 15.

Major communication systeEmergency

100% lighting provided area: 1. Fire Control Centre. 2. PABX. 3. Computer Room. 4. Front Desk. 5. Power

power(Back-up

substation. distribution room. 7. Generator room. 8. Fire fighting Pumps room. 9. Smoke exhaust and

generator)pressurization room. 10. Chiller room. 11. Boiler room. 12. Domestic Pump Room. 13. Magic Center.

应急电源(备用发电ase. lift foyer. 17. Emergency lighting and exit sign. Minimum 11 LUX in other public

机)area.

在市电发生故障时,发电机能在15秒内自动起动供电. 发电机能够容许有25%的超载功能.

有储存24小时用的油箱.自启动备用发电机在市电全停和紧急状态时保障全部消防和生命安全系统用电、客梯、厨房照明及冷库等重要负荷。主要包括以下: 动力部分: 1. 客梯(至少1台) 2.

所有消防栓和喷淋系统(水泵,稳压泵). 3. 烟感和报警系统 4. 程控交换机 5. ,所有冷库和冰箱. 6.

所有污水泵和消防电梯集水坑水泵 7. 中水处理站 8. 生活供水泵(包括冷热水)9.

所有消防加压送风和排烟风机. 10. 电脑房,电脑房分体空调电源,IT系统和UPS. 11. 保安监控系统 12.

消防广播. 13. 停车场的道闸系统. 14. 主要通讯系统.

照明部分:100%照明部分:1.消防控制室.2.交换机房.3.电脑房4.总服务台.5.变配电房.6.配电间7.发电机房.8.消防水泵房.9.防排烟机房.10制冷机房.11.锅炉房.12.生活水泵房.13.总机房(服务中心).14.

电梯机房.15.楼梯间. 16.消防前室. 17. 应急照明和出口疏散指示. 其它公共区域至少保证11 LUX 的照明。Electricity meter电能计量 Meter shall be installed in different location and linked to BMS. See attached format.对不同的区域进行计量并接入BMS系统. 详见附表.56Emergency lighting应急照明Emergency and standby lighting provision shall be provided by a static inverter central battery system(EPS).

Duration of autonomy to be minimum 1.5 hours. Emergency lighting system to be monitored and shall be

controlled by BMS. Areas shall be 100% lit of emergency lighting : 1. Fire Control Centre. 2. PABX. 3. Computer

Room. 4. Front Desk. 5. Power substation. distribution room. 7. Generator room. 8. Fire fighting

Pumps room. 9. Smoke exhaust and pressurization room. 10. Chiller room. 11. Boiler room. 12. Domestic

Pump Room. 13. Magic Center. ase. lift foyer. and evacuation indicator.1.应急照明电源为EPS,持续至少1.5h,应急照明应由BMS系统监控。应急照明达到正常照明(100%)照度的区域:1.消防控制室.2.消防水泵房.3.发电机房.4.配电间5.防排烟机房.6.总机房(服务中心).7.电脑房8.总服务台.9.变配电房.10制冷机房.11.锅炉房.12.生活水泵房.13.交换机房.14.电梯机房.15.楼梯间.16.消防前室. 17.出口指示和疏散指示.

No序号Item项目HILTON Requirement希尔顿要求7Dim

Lighting智能照明Dimming system shall be installed in Lobby, Lobby Bar, Restaurants, Function rooms, Ballroom, Nightclub,

Bar, Executive Lounge, SPA and Sauna.酒店大堂, 大堂吧, 所有餐厅, 会议室, 宴会厅, 夜总会, 酒吧, 行政酒廊最小冬季温度, (度) 最小湿度SPA和桑拿等采用智能照明控制和调光系统.All servers and PCs, including POS Equipment and PABX systems in the hotel are to be linked to a UPS. A

dedicated modular UPS system connected to the Standby Generator must provide not less than 1 hour's

autonomy for computer systems to be attached. Where no emergency generator exists, the UPS must

provide not less than 4 hour's autonomy.

所有服务器,电脑, POS收银机和交换机需和UPS电源连接.

当和应急发电机相连时,能够保证1小时的供电时间,

当没有和发电机相连时,需提供至少4小时的不间断电源8UPS 电源9For guest corridor, provide convenience outlets in corridors for housekeeping equipmentat a minimum of every 50’-0”/15.0m.

对于客房走廊,在走廊每隔至少50英尺/15米,为客房设备提员工用插座。

Sockets for corridors

For service corridor, provide a minimum of one 20 amp duplex electrical convenience outlet on走廊插座each wall with spacing not to exceed 20’-0”/6.0m on center.

对于服务走廊,每面墙上至少提供一个20安培的双孔方便插座,插座之间的中心间距不超过20英尺/6米。参数的采用Distribution boards shall be provided with 25% spare space for fitting out of additional devices. All cables and

switches and boards are to be clearly labelled.

所有配电箱内应预留25%的空位备用.所有配电箱, 电缆和开关要有清晰的标识.Entrance ceiling down and down light inside bathroom is emergency light connecting with EPS, when door

open, the light will turn on by magnetic system; A/C shall be controlled by Room Control Unit system; There

should be 2 electrical line controlling corridor light. At least set aside 1KW/10sqm switch for big performance

in Ballroom.客房入口处廊灯为应急灯连接EPS电源, 当开门时,廊灯通过门磁开关点亮;

客房空调的控制可由房控系统来控制;

客房走廊和天花上的灯具应由两个供电回路供电。宴会厅要有至少每10平方米预留1千瓦的备用开关以备大型演出等用.10Distribution Boards

配电箱11Electricity

distribution in

guestrooms and

ballroom客房和宴会厅配电4 Fire-Fighting System消防系统CommenBOH 后台区域Areas of the Hotel 酒店区域Ref No 序号D&C Section 2516 - FLS Criteria

消防生命安全标准Guestrooms客房Public Areas 公共区1Fire Rated Construction建筑防火等级符合要求Self Closing Doors at Exits

安全出口疏散门能自动闭合Fire Rated Doors 符合消防要求的防火门At least 50% of Exits open directly to outside

至少50%的疏散口直接通向室外All penetrations sealed (Shafts etc)

防火封堵完成(竖井等区域)Rated Fire Dampes at Duct Penetrations

风管穿墙处需安装防火阀Automatic Sprinkler System 自动水喷淋系统Sprinklers in Walk-in Coolers/Freezers

冷库内安装水喷淋Sprinklers in Plant Rooms 机房内安装水喷淋234N/A(不适用)5678N/A(不适用)N/A(不适用)9N/A(不适用)N/A(不适用)

No序号Item项目HILTON Requirement希尔顿要求10Supervised tamper-proof valve on sprinklers

喷淋管道的水流指示器前的阀需带有监控信号连接至消控中心Standpipe & Hose System消火栓和喉卷N/A(不适用)N/A(不适用)最小冬季温度(度) 最小湿度1112Fire Water Storage 消防储存水池N/A(不适用)N/A(不适用)Will

a13Kitchen Hood Protection w Gas Shut Off

厨房排烟罩的自动灭火系统以及联动关闭煤气阀门Hood Suppression connected to Alarm Panel

厨房烟罩自动灭火系统的信号转递至消控中心报警面板Fire Extinguishers灭火器N/A(不适用)N/A(不适用)14N/A(不适用)N/A(不适用)15N/A(不适用)16参数的采用Server Room Suppression

电脑机房内的自动灭火系统Electrical Rooms Suppression

配电和变压器房自动灭火系统N/A(不适用)N/A(不适用)17N/A(不适用)N/A(不适用)18Addressable Smoke Detectors带地址码的烟感19Local Annunciation in Guestrooms Smoke

Detectors客房内安装带蜂鸣器的烟感N/A(不适用)N/A(不适用)20Duct Detectors 风管型烟感N/A(不适用)N/A(不适用)21Manual Fire Alarm Stations at Exits

在所有安全疏散出口手动报警按钮.N/A(不适用)22Fire Panel with Printer 消防控制板和打印机.N/A(不适用)N/A(不适用)23Remote Annunciation Panel in operator room.

在总机房安装远程报警显示副盘.N/A(不适用)N/A(不适用)24Voice Communication System语音通信系统.25Speakers/Horns in building 应急广播和报警.Alarm >75dBA at bedroom pillow

床头位的报警声>75dbAVisible Notification Devices (Strobes) at Exits

在疏散口有明显的指示(频闪灯).Strobe Lights in Handicap Rooms

残疾人房内的声光报警.Means of Egress (Min 2 Exits)

安全疏散(最少2个出口).Stairwell Pressurized or ventilated

楼梯井的正压送风或通风.Panic Hardware for exit doors to exterior on

ground floor, Handrails for staircase.

在首层通向室外的疏散门上安装推杆锁,安装楼梯扶手.26N/A(不适用)N/A(不适用)27N/A(不适用)28N/A(不适用)N/A(不适用)29N/A(不适用)30N/A(不适用)31N/A(不适用)

No序号Item项目HILTON Requirement希尔顿要求32Egress Signage and vertical signage on guestfloor.

疏散指示和客房垂直安全出口指示.N/A(不适用)最小冬季温度(度) 最小湿度Emergency Power Supply (Generator),auto start

within 15 seconds in event of main power loss.

提供应急电源(应急发电机),

正常供电失电时在15秒内自动启动。335 Security, BMS, Accounting, CCTV System etc.弱电系统No序号Item项目1BA楼宇控制系统HILTON 要求The system shall include air handling units, external and flood lighting, energy accounting system, chillers,

boilers, pumps, cooling towers and elevators. 楼宇系统应包括风柜, 室外灯光和泛光照明, 能源计量系统,

制冷机, 锅炉, 泵, 冷却塔和电梯.To control the temperature and equipment operation inside guestroom and receiving inputs from the

Property management system(Fidelio or OnQ) to automatically control the the temperature setpoint

dependant on occupancy within the guestrooms. The system shall be accessed via the check in/out

shall connect with PMS and control guestroom temperature.与酒店管理系统连接,对客房内温度进行监控。2RCU 房控系统参数的采用3Energy accounting

Metering electricity, water, gas and steam and connecting with 能源计量系统(远程对电、水、气、蒸汽等能源消耗进行计量并与BMS相连. 安装为详见附表.抄表系统)Security system安防系统4(A)CCTV system监控系统Electrical power for cameras and monitors shall be supplied from an an emergency power circuit. Shall be

installed: Main entrance(include staff entrance, loading docks, receiving areas, all ATM machines, car park,

forecourt,lift lobby, lift cabin, guest corridor,front dest,restaurant,bar,wine and spirit store,important dry

store,pool,gymnasium,SPA,loading bay,safe adn safe deposit rooms,cash points,general cashier, IT room

entrance, luggage room,power substation,generator,firehydrant room,domestic pump room,hotel perimeter,

all roof doors; Backup storage devices shall be capable of storing 30 days continual recording 系统的电源要和应急电源连接.主要包括酒店主要出入口(包括员工出入口), 卸货区, 收货区,

所有自动取款机位置,停车场,室外庭院,电梯厅,电梯轿厢,客房走廊,前台,餐厅,酒吧,红酒和白酒库房,重要干货仓库,游泳池,健身房,SPA,卸货区,贵重物品存放处,收银点, 总出纳室, IT 机房,

行李房,配电房,发电机房, 消防泵房,生活泵房, 锅炉房,

制冷机房,酒店外围,所有屋顶门等区域;中心设备能够存储30天的记录.(B)Safety alarming

system保安报警系统Provision areas: Front desk, safe deposit room, casher points, swimming pool etc. Panic bar and maganetic

alarming at emergency exit. A designated extension number will be provided for reporting any emergency

condition. Emergency telephones are to be installed in the these area: pool area; fitness center; Spa; Self-parking garages(one minimum per level) and shall be clearly labeled "Emergency Telephone" and shall signal

both Operators' room and Fire control center. These phones will not have a dialing device; The emergency

telephones in Operator room and Fire control center are only to receive calls through the emergency

telephone extension, also are to have a digital readout to identify the extension. Addition panel should be

located in Magic Center as a back up.在酒店前台、贵重物品存放处、收银处、总出纳办公室,

等处需设置相关紧急报警装置。在紧急疏散出口设逃生锁及门磁报警。需一个指定的电话分机号用于报告紧急情况. 紧急电话需安装在这些区域: 游泳池, 健身中心, SPA,

停车场(每层至少一个),并且有"紧急电话"的标签,

可以直接接通总机房和消防控制中心.这些紧急电话没有拨号键.

在总机房和消防控制中心的紧急接听电话只能接听并且带来电显示来确定从何处打来.

消防报警显示副盘应安装在总机房.

No序号Item项目HILTON Requirement希尔顿要求 Door alarm devices or motion detectors(infrared or ultrasonic detectors) are required for: Stairway doors at

the exit level from the hotel; All roof doors; General cashier's office; Main food and beverage storeroom(s)

最小冬季温度(度) 最小湿度and operatng equipment storage. the signals from these devices are to be wired to an alarm annuciator panel

Door Alarming

sensors

门禁系统located in Fire Control Center. Alarm annuciator must indicate the location and type of alarm by visible and

audible signal and have a printer to record the activity including date and time. All alarm systems are to be

connected to the building emergency power supply or have sufficient battery backup(4 hours

minimum).在所有出入口、楼梯走道等处设置巡更系统。门禁系统应安装在以下位置:

楼梯间通向室外的逃生门; 所有通向屋顶的门; 总出纳办公室;

主要食品和饮料仓库及酒店营运设备的库房. 所有报警信号连接到消防控制中心.

消防控制中心通过显示和声音信号能够指明报警位置和报警类型并有打印机自动记录日期和时间.

所有报警系统需连接到应急电源或有足够的备用电池(至少4小时).(C)(D)patrol

system巡更系统Provision of patrol: all entrance and exit, staircase and corridor etc. 所有出入口,楼梯间和走廊等处。5 CATV system有线电视及卫星电参数的采用视系统Cover: all guestrooms, restaurants, private room, lobby bar, bar, nightclub and KTV, executive lounge,

swimming pool, gymnasium, SPA and Sauna private room, meeting rooms, team relaxation room, team

restaurant etc.在所有客房, 餐厅, 餐厅包房, 大堂吧, 酒吧, 夜总会和KTV, 行政酒廊, 游泳池, 健身房, SPA

和桑拿包房, 会议室内, 员工活动室内, 员工餐厅等提供电视点位.6Car park control

system停车场管理系统To provide an automatic car park control system entry and exit to the car park, payment and car park

capacity.要提供车场自动管理系统,负责车辆进、出和车场付费以及车位的信息。Speaker inside guestroom and bathroom connecting with fire-fighting system; need background music source

for chinese restaurant, coffee shop, speciality restaurant, pool , SPA ,porte cochere and other public areas;

Volume switch for different area adn private room; Volume switch for guestroom floor; Volume switch for lift

cabin.客房内应设置应急广播扬声器,卫生间安装吸顶式扬声器与电视伴音相连并能消防强切;

背景音乐音源要有多路音源,提供给不同的餐饮区如:中餐厅,西餐厅,风味餐厅,酒吧, 行政酒廊等; 游泳池;

健身房; SPA, 风雨蓬和其它公共区域; 每个区域和中餐厅,SPA包房内要设音量开关;

客房每个楼层设音量开关; 客用电梯内背景音乐设单独的音量开关.

7Emergency

broadcasting and

background music

system应急广播与背景音乐广播系统8Signal boosting

system手机信号增强系统Walk-talkie and

paging system酒店无线对讲系统及内部传呼系统Shall install signal boosting system and cover all areas.应安装手机信号增强系统,使所有区域都能覆盖。9Shall be installed to easy communication inside hotel.

安装方便酒店内部联络.6. Other Items 其他项目No序号Item项目HILTON 要求Require to be designed by Laundry floor is to be designed to accommodate a live load of

.(1220 kilograms per Meter Square) Isolated slabs are strongly recommended. The sorting

area should be immediately adjacent to the washing area. Provide at least one small machine of 50-75 pound

capacity in each hotel. Ironer must be able to process 2.9mx3.2m sheets. Provide an independent

mechanically refrigerated HVAC system for the laundry. Provide exhaust canopy over all ironers. The central

air compressor plant is to consist of at least 2 compressors(one standby). Provide 80-100 psi(5.5-7.0bar)

compressed air to washer/extractors, large dryers and folders as required. The air intake from the

compressors is to draw air from a cool area other than the machine room. Provide a tough drain under th

centerline of the washers at least 14 inches wide(0.3m) and 18 inches deep(0.4m).

需由洗衣房顾问公司设计.建议地板能承受每平米1220kg的荷载.

脏布草整理区域应靠近水洗区.至少有一台50-75磅的水洗机.

平烫机能处理2.9mx3.2m的床单.安装独立的空调通风系统. 每台熨烫机上部安装抽气罩.

安装2台空压机(一台备用),空压机房具有良好的通风. 预留排水地沟, 具有足够的排水能力(建议

0.3m宽x0.4m深).1Laundry 洗衣房

No序号Item项目HILTON Requirement希尔顿要求Stainless steel angle sheet covering wall corner; See through glass on the door and kick plate for low part of

door; Grease interceptor for each kitchen and general inceptor for all kitchen outside hotel; Floor and gully

grating must be anti-slippery. Main water valves and branch water vlaves should be installed for kitchen.最小冬季温度(度) 最小湿度厨房灶台上烟道用不朽钢材料, 所有阳角要用不朽钢板50mmx50mmx1500mm(高)包裹;

通道门上部设透视窗,下部两面用不朽钢板包裹, 1米高;

各厨房设隔油池并在室外设总隔油池;地面和排水沟盖板要平整防滑. 主供水和分支水阀应安装.Minimum diameter 600mm; Fire rating 2hrs; Fusible link at bottom door; Vent extending minmum 1200mm

above roof comprising with bird screen; Doors shall be interlocked to ensure only one access door may be

opened at a time; Type 304 stainless steel; Sprinkler head on top of chute.内径最小600mm;最短耐火2小时;最底层门用易燃金属丝悬挂;伸出屋顶1200mm,并用防虫网罩住;每个门之间电子互锁,同时只能开启一个门;304不朽钢板;污衣口门能自动关闭并锁上;

井道顶部和每隔一层侧部安装喷淋头.2Kitchen厨房3Linen chute

污衣井道参数的采用Guest elevators客梯4Criteria标准: Maximum waiting time interval最长等梯时间42秒; 85% occupancy开房率; 2.4 occupants per

room 2.4个客人每间房; Handling capacity处理能力12-15%.

Have at least one accessible elevator(1350kg)至少1部残疾人客梯; Minimum load客梯最小载重量1350kg;

Size尺寸2000(W)×1400(D)×2300(H); Door size门尺寸2100(H)×1100(W);

Decoration Load(450KG)装修荷载(450KG); Emergency light(with 2 hours battery, 30LUX on floor

level)有应急灯; Emergency Call between elevator, fire control centre and magic centre在电梯,

消防中心和总机房实现三方对讲; Intercom connected to a constantly mornitor location(monitor located in

fire control center)停靠运行位置监控显示(监控器放在消防中心); Door sensor光幕; Direction

indicator运行方向指示灯; Door bell到站钟; Auto level停电时自动平层功能; LCD display on 2 side of cabin

电梯轿箱两边的LCD显示屏; Background music(emergency broardcast)背景音乐(紧急广播); Double control

panel双控制盘; Hotel function LED button酒店功能区LED按钮显示; Audible signal and travel path indicator

in elevator lobby 电梯厅到站钟和运行方向指示. Card key access to executive floors.

用房卡控制到行政楼层.Split A/C for cabin. 轿箱顶部的分体空调安装.Lighting auto cut off when long time

not running.当电梯长时间没有运行时,自动关闭照明电源.5Service elevators服务电梯Freight elevators

运货电梯Mimimum load载重量不小于1800kg; Minimum cabin size最小轿箱净尺寸不小于2200WX2400DX2800H6Mimimum load载重量不小于2250kg; Minimum cabin size最小轿箱净尺寸不小于2200WX2400DX2800H7Master Keying

Schedule

总钥匙管理There should be 3 grade: (1)1 grade: individual keys; (2) 2 grade: sub-master keys which include the following:

er master key shall operate locks under direct supervision of the engineer. 2. Food and Beverage

master key shall operate locks under direct supervision of Food and Beverage. 3. Housekeeping master key

shall operate locks under direct supervision of Housekeeping Department. 4. Cleaning master key shall

operate locks to offices, meeting rooms and trainning rooms.(3) Grand master key shall operate all locks as

indicated above and must be kept in safe. 分3级管理: 1级: 各个单体钥匙. 2级:分总钥匙1: 工程部--办公室,

机房, 强弱电井以及通向屋顶的门等. 分总钥匙2: 餐饮部--办公室, 厨房,食品库,

餐厅,管事部和厨师长办公室. 分总钥匙3:客房部--办公室, 库房, 洗衣房, 制服房等.分总钥匙4: 清洁使用--所有办公室, 会议室, 培训教室等.3级: 总钥匙: 可以开启以上所述区域.8Provide a frost-proof hose bib adjacent to porte cochere for wash down of paving and walkways. Provide a

water proof convenience elctrical outlet adjacent to the porte cochere and hotel entrance. An irrigation

Courtyard 室外庭院system must be provided to support the maintenance of the exterior

landscaping.在酒店入口处提供防冻的水龙头以便清洗路面和提供防水电源点. 给室外绿化提供灌溉系统.BOH后台区域双扇门Provide selector devices for all double doors so as doors close in proper sequence.

所有后台区双扇门安装门序器.Anti-slippery floor; good ventilation; washing basin and toilets; glass cover for shower area lighting.地面防滑地砖;通风充足;面盆和卫生间;淋浴区防雾灯罩。Locker Room员工更衣室

No序号Item项目HILTON Requirement希尔顿要求The overall standards of the dining room should be as high as it would be if it were a public outlet. Easy to

clean and non-slippery floor. Wall pictures, built-in warm color lighting with dimming system. TV sets, Tel and

background music with volume switch.

最小冬季温度(度) 最小湿度整体标准如酒店内部的一个客用餐厅.地面要防滑和便于清洁;墙面有壁画;嵌入吊顶式暖色灯具,

能分路调光;电视、电话和背景音乐(有独立的音量开关)。Team Restaurant员工餐厅Floor in Mechanical

Room 机房地面Floors should be tiled or expoxy resin paint in mechanical room. 机房地面应贴地砖或刷环氧树脂油漆.Lighting in

Mechanical Room

机房照明Penetration Sealed

up 洞口封堵A minimum of thirty(30) foot candles(322 lux) of general lighting is required. Emergency lighting must be

provided. 至少322流明度的照明. 必须提供应急照明.All pipes and ducts penetration should be sealed up properly. 所有穿墙管周边洞口要用防火材料封堵.Protection of outside

Bumper rails should be installed for protection of exposed pipe and firehydrants.室外管道,

参数的采用pipes 室外管道防护消防栓等需安装防撞护栏.Equipment and pipe

There should be clear signage of equipment and pipes.各个机房设备、管道要有清晰的标识.sign 设备管道标识Anti-slippery brick or paint; washable paint and bumpr rails at both sides of the wall; Stainless steel cover or

wall corner.地面为防滑地砖或刷防滑漆;墙面刷可擦洗的涂料并在两侧墙面做防撞护栏,离地1米高;墙阳角处下部包50mm(边)x50mm(边)x1500mm(高)的不朽钢护角.Corridor of BOH

后台走廊Hilton Hotel’s Utilities Metering Requirement 安装标的位置Gas

Location位置Guest rooms 客房Ballroom 宴会厅Meeting

rooms会议室Business

Centre商务中心Restaurant 餐厅SPA and

Sauna水疗和桑拿Pool 游泳池Beauty salon

美容美发Cold Water冷水Hot Water热水Steam蒸汽Electricity电 XX X X X X X X X X X X X XHealth Clubs

健身中心BAR 酒吧Cooling tower make

up 冷却塔补水 X X X X X

No序号Item项目HILTON Requirement希尔顿要求Chilled water make

up 制冷系统补水 XKitchen 厨房Laundry 洗衣房

Lifts电梯Shops 商店Staff Housing

员工宿舍Public areas

公共区域Back of House

后台区域参数的采用External Lighting

室外照明 X X X X最小冬季温度(度) 最小湿度 X XX X X X X X X X XLockers 员工更衣室Car parks 停车场Chillers & cooling

tower

制冷机和冷却塔 X X X X XWater pumps 水泵 XGardens irrigation

绿化灌溉 XMake-up to hot

water热水补水 XBoiler make-up锅炉补水Boiler 锅炉X X X

No序号Item项目HILTON Requirement希尔顿要求Overseas TV Program

境外电视节目

最小冬季温度(度) 最小湿度(Only for reference, need to be adjusted based on local

market仅供参考,需根据当地市场情况来定)12345678参数的采用9161718192CNN美国有线电视新闻网BBC WORLD英国广播公司世界频道NHK日本广播电视频道TV5法国电视5台

DW德国之声

CNBC全国广播公司亚太财经频道BLOOMBERG彭博财经电视亚太频道HBO家庭影院亚洲频道

CINEMAX亚洲频道STAR MOVIE卫视国际电影台

HALLMARK贺曼娱乐电视网电影台AXN索尼动作影视娱乐频道

PHOENIX MOVIE凤凰卫视电影台

NGC国家地理亚洲频道DISCOVERTY探索亚洲频道

MTV MANDARIN全球音乐电视台中文频道CHANNEL [V]音乐台ESPN美国有线体育电视网STAR SPORTS卫视体育台

PHOENIX CHINESE凤凰卫视中文台

PHOENIX INFORMATION凤凰卫视资讯台HORIZON CHANNEL 新知台

TVB8香港无线八频道

TVB GALAX香港无线星河频道

CETY华娱卫视

在电视系统设计上可预留一套收视设备供酒店用于自办节目或用于酒店电视开机宣传画面应用.

希尔顿酒店机电要求要点

本文发布于:2024-01-31 11:36:16,感谢您对本站的认可!

本文链接:https://www.4u4v.net/it/170667217628234.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:系统   安装   自动
留言与评论(共有 0 条评论)
   
验证码:
排行榜

Copyright ©2019-2022 Comsenz Inc.Powered by ©

网站地图1 网站地图2 网站地图3 网站地图4 网站地图5 网站地图6 网站地图7 网站地图8 网站地图9 网站地图10 网站地图11 网站地图12 网站地图13 网站地图14 网站地图15 网站地图16 网站地图17 网站地图18 网站地图19 网站地图20 网站地图21 网站地图22/a> 网站地图23